An MRP profile is a preset of default values for the MRP fields of the material master. Create it with MMD1, enter it in MM01, and SAP fills your MRP views automatically.
MRP Profile Example MM01 in SAP -
In SAP Materials Management, an MRP (Material Requirements Planning) profile in the Material Master is like a preset or template that contains default settings for planning and managing materials in a manufacturing or supply chain process. It helps to streamline and standardize how materials are planned...
In plain words, instead of typing the same MRP type, lot size, reorder point and scheduling data again and again for every new material, you create one profile, give it a key, and enter that key while creating the material. SAP then copies the stored values into the MRP views of the material master. For a company that creates hundreds of materials a year, this single habit saves hours of data entry and, more importantly, removes the small differences that creep in when different people key in different values for the same kind of material.
1) MRP Profile Example MM01 in SAP -
Menu Path: Logistics -> Materials Management -> Material Master -> Profile -> MRP Profile
From this menu path you reach the three profile transactions: Create (MMD1), Change (MMD2) and Display (MMD3). The same node also holds other profile types, such as the Create Profile for Material Master, which is why it is easy to open the wrong one at first. Always check that the screen title says "MRP Profile" before you start typing.
When you work in an SAP system, think of the profile as a bridge between two roles. The planning team decides how a class of materials should be planned; the master data team simply applies that decision through the profile key. Nobody has to remember eight or ten field values, only one key.
✅ MRP profile can include settings :- Understanding Process -:
-1) Planning Type:- Whether the material is planned automatically, manually, or not planned at all.
-2) Reorder Level:- At what stock level the system should trigger procurement or production.
-3) Lot Size:- How much quantity to procure or produce at a time.
-4) Schedule Margin Key:- Time buffers for various stages of material planning and procurement.
The planning type is stored in the field MRP Type. Typical values are PD (MRP), VB (manual reorder point planning), VM (automatic reorder point planning) and ND (no planning). A profile that carries PD tells SAP to include the material in the regular MRP run; a profile that carries ND keeps it out completely, which is useful for small consumables you never want planned.
The reorder level is the stock quantity at which the system creates a requirement. It only makes sense with reorder-point MRP types (VB, VM). Because the right quantity differs from material to material, many companies leave this field out of the profile or mark it as changeable.
The lot size decides how much is ordered when a shortage is found. EX is lot-for-lot (order exactly the shortage), FX is a fixed quantity, HB is replenish-to-maximum and WB/MB/TB group requirements by week, month or day.
The scheduling margin key holds the float before production, float after production and release period used to calculate dates for in-house production orders. It lives in MRP view 2 and is a favourite field for profiles of manufactured items.
| Profile setting | Example value | What SAP does with it |
|---|---|---|
| MRP Type | PD | Includes the material in the normal MRP run |
| Lot Size | EX | Orders exactly the shortage quantity |
| Reorder Point | 100 PC | Triggers procurement below this stock |
| Scheduling Margin Key | 001 | Adds float days when dates are scheduled |
✅ CREATE MATERIAL MASTER MM01 - SELECT MRP PROFILES -
Start MM01, enter the material number, industry sector and material type, then look at the lower part of the initial screen. The Profile field accepts the MRP profile key you created. Pick your MRP views in the view selection and continue to the organizational levels (plant, storage location). When the MRP screens open, the profile values are already there.
✅ MRP Parameters - MM01
✅ 1) MRP Type (MRP1 View):- Determines the type of planning (e.g., MRP, reorder point planning, manual reorder).
✅ 2) Lot Size (MRP1 View):- Specifies how procurement quantities are determined (e.g., lot-for-lot, fixed lot size).
✅ 3) Reorder Point (MRP1 View):- Triggers procurement when stock falls below the specified level.
✅ 4) Planning Strategy (MRP3 View):- Defines whether the material is planned using make-to-stock (MTS) or make-to-order (MTO) strategies.
TCODE-MMD1 - (Create Profile)...
TCODE-MMD2 - (Modify Profile)...
TCODE-MMD3 - (Display Profile)...
| T-Code | Purpose | Use it when |
|---|---|---|
| MMD1 | Create MRP profile | A new planning pattern is needed |
| MMD2 | Change MRP profile | A default value must be updated |
| MMD3 | Display MRP profile | You only want to check what a key contains |
| MM01 | Create material | You want the profile to fill the MRP views |
✅ Steps to Assign an MRP Profile to a Material Master:
Use transaction MMD1 to create an MRP profile -
Set the default values for relevant MRP fields -
On the MMD1 screen give the profile a key (up to four characters) and a short description, then fill the fields you want to default. For each field you can normally decide whether the value is only a default that the user may overwrite, or a fixed value that cannot be changed in the material master. Use fixed values sparingly: they protect standards, but they also block legitimate exceptions.
In the MRP views (MRP1, MRP2, etc.), specify the MRP profile in the MRP Profile field.
You can enter the profile on the MM01 initial screen, or later in the MRP 1 view. If you type the key in the view itself, SAP offers to copy the profile values; confirm and the fields are refreshed.
Review every populated field once; the profile fills the data but you remain responsible for it. Check MRP type, MRP controller, lot size and planned delivery time, then press Save.
THEN CHECK AND SAVE -
Samshai Rao the planning lead at Learn Pharmaceuticals, Pune, wants every packing carton to be planned the same way: MRP type PD, lot size EX, one-day float and a standard MRP controller. He opens MMD1, creates profile PK01 with these defaults and saves. Radha Apte from the master data team then opens MM01 for the new carton CARTON-5L, selects the MRP 1, MRP 2 and MRP 3 views, and types PK01 in the Profile field. Every MRP field is filled before she touches the keyboard. Rudra Patil later asks why one carton needed a different lot size; Radha simply overwrites the lot size in MRP 1, because Vikram had marked that field as a default rather than fixed.Pooja Mishra from audit compares ten cartons a month later and finds identical planning data, which is exactly the consistency the profile was built to give.
| Benefit | Why it matters |
|---|---|
| Less manual effort | One key replaces many keystrokes in every MRP view. |
| Consistency | Similar materials share identical planning logic. |
| Fewer errors | No wrong MRP type, no missing lot size, no invalid procedure. |
| Faster onboarding | New data-entry users only need to know the profile keys. |
| Easy maintenance | Standards are defined once, in one place. |
A profile only supplies defaults at creation time. Changing the profile later does not rewrite materials that already exist, so use mass maintenance (MM17) when many materials must be aligned. The profile also cannot know plant-specific facts such as vendor lead times, so treat it as a starting point rather than the final answer.
| Problem | Likely cause | Fix |
|---|---|---|
| Profile key not found | Profile not created or typed wrongly | Check with MMD3 or create it in MMD1 |
| Fields not filled | MRP views not selected in MM01 | Select MRP 1 to MRP 3 on the view screen |
| Cannot change a field | Field is fixed in the profile | Change it in MMD2 or ask the planning owner |
| "Specify a valid MRP procedure" | Invalid MRP type value | Correct the MRP type; see the MM error tutorial 13 in the menu |
Name profiles by purpose (for example PK01 for packing, RM01 for raw material), document each one in a short sheet, review them once a year, and restrict MMD1/MMD2 authorization to a few planners. In SAP S/4HANA the transactions still exist, though many customers also use MRP areas and MRP live; the profile logic remains useful.
Beginners often mix up three similar terms. The MRP type is a single field that says how a material is planned (PD, VB, VM, ND). The MRP group is a key that controls planning strategy details such as the strategy group and consumption mode, and it is set in customizing. The MRP profile is a bundle of default values for many fields at once, including the MRP type. So the profile can contain an MRP type, but an MRP type cannot contain a profile.
| Term | What it is | Where it is maintained |
|---|---|---|
| MRP Profile | Template of default values for many MRP fields | MMD1 / MMD2 / MMD3 |
| MRP Type | One field that defines the planning method | MRP 1 view of the material |
| MRP Group | Key that controls planning strategy behaviour | Customizing and MRP 1 view |
| MRP Controller | Planner responsible for the material | MRP 1 view of the material |
When you plan which fields to include in a profile, it helps to know which view each field belongs to. The table below lists the fields most companies put into a profile.
| View | Typical fields | Notes |
|---|---|---|
| MRP 1 | MRP type, reorder point, MRP controller, lot size, planned delivery time | Core planning data; most profiles live here |
| MRP 2 | Procurement type, scheduling margin key, in-house production time, GR processing time | Procurement and scheduling data |
| MRP 3 | Strategy group, consumption mode, availability check, planning time fence | Make-to-stock or make-to-order behaviour |
| MRP 4 | Individual/collective requirements, repetitive manufacturing, BOM explosion data | Used for assemblies and production |
Open MMD1
Type MMD1 in the command field and press Enter. The Create MRP Profile screen opens with the field "MRP profile" at the top. Enter a key such as PK01 and a description such as "Packing material, PD, lot-for-lot".
Maintain the field values
Fill MRP type, lot-sizing procedure, MRP controller, scheduling margin key and any other field you want to standardize. For each field decide whether it will be a default or a fixed value, as explained earlier.
Save and test
Press Save, then display the profile in MMD3 to verify. Create one test material in MM01 using the profile and open each MRP view to confirm that the values arrived. Always test in the quality system before the profile is used in production.
Document and communicate
Publish a short list of profile keys, what each is used for and who owns it. A profile nobody knows about will never be used.
If you later decide to apply a profile to materials that already exist, there are three practical options. First, edit each material in MM02 and enter the profile in the MRP 1 view. Second, use mass maintenance (MM17) to set the fields for many materials together. Third, use a data migration tool such as LSMW or LTMC for very large lists. Whichever way you choose, remember that planning data changes affect open planning results, so run the change outside the MRP run window and recheck the planning file afterwards.
Rudra Patil, the procurement manager at Learn Pharmaceuticals, Pune, buys steel sheets that are consumed daily. He asks Vikram Nair for a reorder-point profile: MRP type VB, reorder point maintained per material, lot size FX with a fixed quantity and a planned delivery time of seven days. Vikram creates profile RM01 in MMD1 and leaves reorder point and lot quantity as default values, because they depend on the sheet thickness. Radha Apte then creates eight sheet materials in MM01 in a single afternoon. For each one she enters RM01, adjusts only the reorder point and fixed lot quantity, and saves. The first time stock falls below the reorder point, the system creates a planned order notice for the buyer, exactly as designed.
Access to MMD1 and MMD2 is controlled through authorization object M_MTDI_ORG and related material master objects, so only a small planning team should hold it. MRP profiles are customizing-like master data; if your landscape requires them in quality and production, create them in each client or use the transport options your Basis team supports. Always confirm with the Basis team before assuming a profile will move with a normal transport request.
Q1. What is an MRP profile? A template of default values for MRP fields in the material master.
Q2. Which transaction creates it? MMD1; MMD2 changes it and MMD3 displays it.
Q3. Can a user override profile values? Yes, unless the field is marked as a fixed value.
Q4. Does changing a profile update existing materials? No. Existing materials keep their values until they are changed manually or by mass maintenance.
Q5. Where do you enter the profile in MM01? On the initial screen in the Profile field, or in the MRP 1 view.
Q6. Name two benefits. Consistency and faster material creation.
If the profile does not behave as expected, work through this list. Confirm the key exists in MMD3. Confirm the MRP views were selected in MM01. Confirm the plant is defined for MRP. Check whether the field was marked fixed in the profile. Check whether another default, such as a reference material, has overwritten your values. Finally, compare the saved material in MM03 with the profile in MMD3, field by field, to find any mismatch.
In SAP S/4HANA the material master is still created with MM01 (or the Fiori app Manage Product Master Data), and the MRP profile concept continues to work. What changes is the planning engine around it. Many S/4HANA customers run MRP Live (MD01N), which is faster and works at the level of MRP areas, and they use Fiori apps such as Monitor Material Coverage and Manage Planned Orders. None of this removes the need for clean master data: an MRP profile still guarantees that MRP type, lot size and MRP controller are set the same way for similar products.
A simple naming standard makes profiles self-explanatory. The table below shows one convention that a mid-size company like Learn Pharmaceuticals could adopt.
| Profile Key | Used For | MRP Type | Lot Size |
|---|---|---|---|
| PK01 | Packing material, daily consumption | PD | EX |
| RM01 | Raw material with reorder point | VB | FX |
| FG01 | Finished goods, make-to-stock | PD | EX |
| CN01 | Consumables, no planning | ND | - |
Whatever convention you choose, write it down and apply it from day one. Teams that skip this step usually end up with dozens of overlapping profiles that nobody dares to delete.
To check your understanding, try this in a training client. Create profile ST01 in MMD1 with MRP type PD and lot size EX. Display it in MMD3. Create a material in MM01 with the profile on the initial screen. Open MRP 1 and confirm that MRP type and lot size are filled. Change the lot size to FX manually and save. If SAP lets you, the field was a default; if it refuses, the field was fixed. Then change the profile in MMD2 and observe that the material you already created keeps its own value. This short exercise teaches nearly everything about how profiles behave.