SAP S/4HANA Migration Step-by-Step Guide (Phases 1–9 Explained in Detail – 2025 Edition)

SAP TUTORIALS-

SAP S/4HANA Migration? Phase 1 To 9 Step-by-Step Detailed Guide

Introduction-


✅Complete SAP S/4HANA Migration Process: Phase 1–9 Full Implementation Guide-

SAP S/4HANA migration is one of the most important subject in the SAP world-wide now a Days.Also Many questions in mind But what is this migration? Why is it needed? And what are the steps involved?

Many companies are moving from older SAP systems Example- SAP ECC 6.0 (SAP ERP 6.0) to the new SAP S/4HANA system.

SAP S/4HANA?-SAP S/4HANA is the latest ERP (Enterprise Resource Planning) system from SAP

SAP – The company name.

S – Simple.

4 – 4th generation.

HANA – High-Performance Analytical Appliance.

💡 Note: The SAP S4 HANA SAP – The company name, S – Simple, 4 – 4th generation, HANA – High-Performance Analytical Appliance...Migration means moving from the current system (like SAP ECC) to the new SAP S/4HANA system.
Trulli Trulli

✅Main Benefits of Migrating:-

1)-Real-time analytics and reporting:-

2)-Faster data processing:-

3)-Easy integration with cloud and AI tools:-


✅ Phase 1: Planning and Assessment-

1) ✅ -Step 1: Understand Your Current Landscape:-

-Identify your SAP ECC version (e.g., ECC 6.0 EHP 8).

-Note OS, database (Oracle, SQL Server, DB2, etc.), and system size.

-Identify custom developments (Z-programs, enhancements, user-exits).

-List all add-ons and interfaces with external systems.


✅ Use This Tools:-

-SAP System Data Browser (SE16N):-

-ST03N (workload statistics)

-SM13, SM37 (batch jobs)


2) ✅ Step 2: Run SAP Readiness Check:-

-Go to SAP Note 2290622 → download Readiness Check 2.0.:-

-Run in your ECC system:-

-Add-on compatibility,Business function usage,Simplification items,Custom code impact,Recommended S/4HANA version,



3) ✅ Step 3: Run SAP Readiness Check:-

-SAP Note 2502552 (Simplification Item Check).

-Identifies deprecated or changed data models (e.g., classic GL → Universal Journal).


4) ✅ Step 4: Run SAP Readiness Check:-

-Greenfield- New install, migrate selected master + open transactional data only

-Brownfield- Convert existing ECC system in place.

-Hybrid- Selective data transition.


5) ✅ Step 5: Define System Landscape & Sizing:-

-Choose deployment: On-Premise, RISE with SAP (Private Cloud), or Public Cloud.

-Use SAP Quick Sizer Tool to estimate HANA memory, CPU, and disk requirements.

-Plan environments: DEV, QA, PRD, and Sandbox.


✅ Phase 2: Preparation-

6) ✅ Step 6: Technical Preparation:-

-Update your ECC to SAP ERP 6.0 EHP 7/8.

-Convert to Unicode (mandatory for HANA).

-Maintain latest SPAM/SAINT, ST-PI, ST-A/PI components.

-Check and clean obsolete data (archiving).

✅Note Key- It Can Be 📌 Tools Used:- 1)-SAP Readiness Check , 2)-SAP Transformation Navigator 3)-SAP Migration Cockpit 4)-ABAP Test Cockpit (ATC)


7) ✅ Step 7: Maintenance Planner:-

-Open maintenanceplanner.sap.com.

-Connect your ECC system to the SAP Solution Manager LMDB.

-Plan the target product version (e.g., S/4HANA 2023 FPS1).

-Generate stack.xml file (input for SUM tool).


8) ✅ Step 8: Backup and System Copy:-

-Perform full database + file system backup.

-Create sandbox copy for dry-run conversion testing.


✅ Phase 3: Preparation-

9) ✅ Step 9: Use Software Update Manager (SUM) with DMO:-

-DMO = Database Migration Option – combines system upgrade + DB migration + Unicode conversion.


✅ -Execution All Steps:

1)-Copy stack.xml (from Maintenance Planner) to /usr/sap//SUM..

2)-Run SUM (via ./SUM/STARTUP).

3)-Choose DMO scenario./b>

4)-SUM performs:- Pre-checks,Software update,DB migration (to HANA),Shadow instance creation,Downtime execution phase,Post-processing, Then-Monitoring: via SUM UI (port 1129).


10) ✅ Step 10: Post-Migration Database Validation:-

-Use transaction DBACOCKPIT to check database statistics.

-Run consistency checks (RSPARAM, DB02)..

-Verify user authorizations, background jobs.


✅ Phase 4: Data Migration-

11) ✅ Step 11: Migrate Master Data & Transactional Data:-Tools

-SAP Migration Cockpit (LTMC) or Fiori App (F3473).

-SAP Data Services (BODS) for complex ETL.

-SAP Information Steward for data quality.


- Main Key Objects:

-Business Partner (master),Materials (MARA),Vendors/Customers (KNA1/LFA1 → BP),GL Accounts, Cost Centers, Profit Centers,Open POs/SOs, Balances


12) ✅ Step 12: Validate Migrated Data

-Run reconciliation between ECC and S/4HANA:- Check Trial Balance (F.01 vs FAGLB03),Open items (FBL1N/FBL3N/FBL5N), Then Check Stock quantities (MB5B/MB52)


13) ✅ Step 13: Validate Migrated Data

-Run reconciliation between ECC and S/4HANA:- Check Trial Balance (F.01 vs FAGLB03),Open items (FBL1N/FBL3N/FBL5N), Then Check Stock quantities (MB5B/MB52)


✅ Phase 5: Custom Code Migration-

13) ✅ Step 13: Custom Code Analysis

-Run ABAP Test Cockpit (ATC) with S/4HANA compatibility checks.

- Check- Obsolete functions (e.g., BSEG access, index tables).

- Check- Code using removed transactions..

- Check- HANA incompatibility (native SQL, non-Open SQL).


14) ✅ Step 14: Custom Code Adaptation

-Use SAP ADT (ABAP Development Tools) in Eclipse.

-Adapt or redesign custom objects.

-Retire unused Z-objects > 5 years old.


✅ Phase 6: Functional Adaptation-

15) ✅Step 15: Simplification Checks

-Business Partner (BP) replaces Customer & Vendor master.

-Universal Journal (ACDOCA) replaces all classic FI/CO tables.

-Material Ledger (mandatory) for inventory valuation.

-Credit Management (FSCM) replaces classic credit control.

-Profit Center Accounting integrated in GL.


16) ✅Step 16: Configuration Adjustments

-Activate new S/4HANA Business Functions via SPRO.

-Adjust number ranges, posting periods, and field status groups.

-Reconfigure logistics integration with FI (posting categories).


17) ✅Step 17: Fiori App Deployment

-Install SAP Fiori Launchpad (Gateway Front-End Server)..

-Assign catalogs & groups to roles..

-Test core apps: My Inbox, Manage Purchase Orders, etc.


✅ Phase 7: Testing-

18) ✅Step 18: Unit Testing-Developers validate each module separately.

19) ✅Step 19: Integration Testing-Cross-module testing (MM-FI, SD-CO, PP-MM).

19) ✅Step 20: User Acceptance Testing (UAT)-Business users validate end-to-end processes. also Document all deviations & fixes.


✅ Phase 8: Go-Live & Post Migration

21) ✅Step 21: Cutover Plan

-Freeze transactions in ECC.

-Take final delta data extract.

-Perform cutover weekend activities (stop batch jobs, lock users).


22) ✅Step 22: Go-Live

-Switch to S/4HANA PRD.

-Unlock users, schedule background jobs, and verify interface connectivity.


23) ✅Step 23: Post-Go-Live Support

-Monitor performance via ST02, ST03N, SM50, DBACOCKPIT.

-Hypercare period ≈ 4 weeks.

-Continuous improvement + user training.


✅ Phase 9: Continuous Optimization

24) ✅Step 24: Enable Innovation

-Adopt AI/ML integration, predictive analytics, and embedded BPC.

-Leverage SAP BTP extensions.


May Be Like Important Link-

-Display G/L Account Balance Display-FAGLB03

-Valuation class 3000 not allowed for material type SAMSUNG RAW MATERIAL

-Ship.condition 02 loading grp 0003 plant 3005 StLoc FIN Not defined

-Document 90039783 saved (no accounting document generated)